EC 2024/3019 or the Urban Wastewater Treatment Directive (UWWTD) puts big pressure on utilities.
Here is a tested framework to help.

Photo by Patrick Federi on Unsplash. Top view of wastewater treatment stages in Switzerland.
Solutions for Utilities in the new UWWTD (EU) 2024/3019
Grab My Self-Assessment Tool for Your Wastewater Utility Facing the UWWTD
UWWTD Strategic Readiness: The Utility Mandate
Directive (EU) 2024/3019 | Operational & Technical Pivot
Updated: January 2026
The recast Urban Wastewater Treatment Directive (Directive EU 2024/3019) resets the operational and financial landscape for utilities. For operators, the challenge lies in bridging the €28.6 billion investment gap while navigating the new 80/20 Extended Producer Responsibility (EPR) funding model.
“Success requires a bridge between scientific monitoring and financial architecture. The utilities that thrive will use technical data to secure fair funding from Producer Responsibility Organizations (PROs).”
Part I: The Quadruple Mandate
Four core pressures reshaping wastewater operations through 2045:
| Mandate | Technical Impact | Timeline |
|---|---|---|
| 1. Quaternary Treatment | Technological Leap: Advanced oxidation (Ozone/AC) and micropollutant removal. | 2027 – 2045 |
| 2. Energy Neutrality | Operational Pivot: Transitioning WWTPs into net-zero energy and bio-hubs. | By 2045 |
| 3. Expanded Scope | Infrastructure: Upgrading smaller agglomerations (1,000-2,000 p.e.). | By 2035 |
| 4. Data-Driven Monitoring | Strategic Role: Utilities become critical generators of data for EPR validation. | Continuous |
Part II: Technical-Strategic Dimensions
Organizational Agility
Adapting through Network Action Learning and collaborative innovation across European clusters.
Technical Capability
Selection and validation of Quaternary treatment technologies based on specific influent profiles.
Nexus Architecture
Navigating the data flow between scientific monitoring and 80/20 EPR funding models.
Strategic Audit: Technical-Financial Nexus
I provide the scientific gap analysis and technical-strategic modeling required to bridge the EPR financial model. This service provides the technical validation required for fair funding negotiations with Producer Responsibility Organizations (PROs).
- Scientific assessment of technology options for micropollutant removal.
- Technical data validation for 80/20 EPR cost allocation strategy.
- Strategic Roadmap for PRO negotiation based on facility-specific evidence.
Scientific Advisory Only. I provide the data validation and technical modeling used by financial and legal teams. Final compliance liability remains the client’s responsibility.
Dr. Ana Carolina Maganha de Almeida, PhD
EU Environmental Compliance Strategist | Water & Life Sciences
With 22 years of water quality expertise, I work at the intersection of utilities, regulators, and industry to navigate complexity through Network Action Learning.
- Environmental Risk Assessment (ERA)
- UWWTD/EPR Technical Mitigation
- Innovation Strategy & NAL
- Regulatory Data Analytics

Leave a comment